Lafarge Chosen for New Creative and Cultural Studies Faculty
June 2008
The flexibility of our Lafarge GTEC systems has been demonstrated once again with a specified contract to supply all the drylining requirements for a striking new building known as the ‘ATRiuM’ at the University of Glamorgan.
October 2007
Lafarge Plasterboard has supplied all the drylining requirements for the newly opened Redland Green School in Bristol. The £33m secondary school, designed by architects BDP for Bristol City Council, features the very best in contemporary education design including a 12m high atrium known as the Street and a roof top relaxation and study area.
Lafarge Plasterboard Chosen for New Cine UK Complex
October 2007
The strength of Lafarge Plasterboard’s acoustic partitioning range has been demonstrated once again with a specified contact to supply all the drylining requirements for a new Cine UK complex, currently being built as part of the Eden, High Wycombe shopping and leisure development.
Lafarge and Sheffield Work Together on Swansea Leisure Centre
October 2007
Lafarge Plasterboard has been specified for all the drylining requirements in the £32m refurbishment of Swansea Leisure Centre, currently being carried out by Laing O’Rourke Construction.
October 2007
Lafarge Plasterboard has supplied all the drylining requirements for the recently opened Jackson Square shopping centre extension in Bishops Stortford.
GTEC Aqua board from Lafarge is the latest innovation in gypsum board. It offers you a new dimension in gypsum board solutions for wet environments for both internal and external applications.
Lafarge Plasterboard operates a fully equipped Drywall Training Centre, giving our customers the opportunity to increase profits through greater knowledge and installation efficiency